Issued: June 10, 2024 by:

Boise Mold Removal

Tylor Desilet
PO Box 785
Caldwell, ID 83606
US
Expires:

July 10, 2024

VAT

Attachments


  • unnamed (1)

  • unnamed

  • Boise Mold Removal Warranty Process Overview

Estimate

Task 1.0

Pull carpet back and create a walkway with drop clothes so the site is clean.

Rate

$85

Qty

1

%

Amount

$85

Task 2.0

Contain Area for Remediation (Containment eliminates any contaminates from existing into the livable space. Without the containment also the insulation, if removed can possibly enter the livable space, kicking insulation, dirt and possible mold-like substance around. We can pull the containment after remediation has taken place. Cost is relayed on a linear foot basis)

Rate

$32

Qty

14

%

0%

Amount

$448

Task 3.0

PPE (Personal Protective Equipment) (This is safety equipment for our techs to wear during remediation practices. This is a per person per day basis. There will need to be new PPE every day for proper safety. This includes the Tyvek suits, gloves, and any filters per the duration of the job).

Rate

$75

Qty

5

%

0%

Amount

$375

Task 4.0

Run air scrubber (An air scrubber is designed with a dual filtered system in an arear to eliminate any possible contaminates from going through the home. The air scrubber is ran on a daily based per the whole duration of the job.)

Rate

$75

Qty

3

%

0%

Amount

$225

Task 5.0

Removal of drywall in closet on the ceiling and walls.(Drywall is removed at times to expose areas where remediation is to take place. This cost is a square footage cost.)

Rate

$0.80

Qty

80

%

0%

Amount

$64

Task 6.0

Removal of batt insulation in the walls of the closet.(This includes bagging up the insulation and disposing of it. IICRC certification requires all mold remediation companies to remove insulation when the growth is over 10sqft. This is a square footage calculation.)

Rate

$1.80

Qty

16

%

0%

Amount

$28.80

Task 7.0

Replacement of vapor barrier in the crawlspace (Vapor barrier is removed is there is water intrusion or contamination from possible microbial growth. The industry standard requires that all vapor barrier be removed when possible microbial growth is over 10sqft.)

Rate

$215

Qty

1

%

0%

Amount

$215

Task 8.0

Pre and Post HEPA vacuuming (HEPA vacuuming is a process of pulling all contaminates off a surface area. This process eliminates mold particles from a surface area with specific vacuums without contaminating the air quality of a livable space. HEPA vacuuming is normally done before and after to reassure no particles are in the space that was contaminated).

Rate

$625

Qty

1

%

0%

Amount

$625

Task 9.0

Treatment with anti-microbial solution in an area of accessible attic space. Also the treatment of the closet in the master. Then finally in the crawlspace.(Treatment is performed with an anti-microbial solution that eliminates and prevents future growth. All treatment is warrantied for 3yrs. unless Boise Mold Removal does not provide a warranty under the stipulations of the client not solving the underlying issue that caused the growth in the first place.)

Rate

$2,345

Qty

1

%

0%

Amount

$2,345

Task 10.0

Install New Batt Insulation in walls and crawlspace. (Insulation R-value will be determined by the standard that Idaho has set for various areas of the home and the region of the state signified through the IDAHO ENERGY CONSERVATION CODES.)

Rate

$475

Qty

1

%

0%

Amount

$475

Task 11.0

Installation of drywall (Drywall will be replaced with the same size drywall, it will be hung, taped, textured and paint to match the rest of the home.)

Rate

$775

Qty

1

%

0%

Amount

$775

Yet to be Approved

Info & Notes

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Estimate is Expired

Estimate History

Status Update 47 days ago

Status changed: Draft to Pending.

Updated 47 days ago

Estimate updated by Tylor.D.

Updated 47 days ago

Estimate updated by Tylor.D.

Updated 47 days ago

Estimate updated by Tylor.D.

Viewed 46 days ago

Estimate viewed by for the first time.

Viewed 16 days ago

Estimate viewed by 2a03:2880:f806:18:: for the first time.

Viewed 13 days ago

Estimate viewed by 2a03:2880:27ff:7::face:b00c for the first time.

Viewed 7 days ago

Estimate viewed by 2a03:2880:f806:15:: for the first time.