Task 1.0

Onsite Dumpster pricing (Dumpster is required to haul all vapor barrier and batt insulation out of the crawlspace.)

Rate

$550

Qty

1

%

Amount

$550

Task 2.0

Contain Area for Remediation (Containment eliminates any contaminates from existing into the livable space. Without the containment also the insulation, if removed can possibly enter the livable space, kicking insulation, dirt and possible mold-like substance around. We can pull the containment after remediation has taken place. Cost is relayed on a linear foot basis)

Rate

$32

Qty

12

%

0%

Amount

$384

Task 3.0

Run Air Scrubber (An Air Scrubber is designed to filter the area and eliminate any possible contaminates. The air scrubber is ran on a daily based per the whole duration of the job.)

Rate

$75

Qty

5

%

Amount

$375

Task 4.0

Removal of Vapor Barrier in the Crawlspace (Vapor barrier is removed is there is water intrusion or contamination from possible microbial growth. The industry standard requires that all vapor barrier be removed when possible microbial growth is over 10sqft. This is a square footage calculation.)

Rate

$0.25

Qty

2951

%

0%

Amount

$737.75

Task 5.0

Removal of Batt Insulation. The insulation will need to be removed to eliminate potential contamination. (The industry standard requires all insulation to be removed if there is over 10sqft. of possible microbial growth.)

Rate

$2.55

Qty

2951

%

0%

Amount

$7,525.05

Task 6.0

Treatment With Anti-microbial Solution (Treatment is performed with an anti-microbial solution that eliminates and prevents future growth. All treatment is warrantied for 3yrs. unless Boise Mold Removal does not provide a warranty under the stipulations of the client not solving the underlying issue that caused the growth in the first place. This is a square footage calculation.)

Rate

$1.55

Qty

2951

%

0%

Amount

$4,574.05

Task 7.0

Install New Vapor Barrier (Install new vapor barrier in the crawlspace. The vapor is to cover all the dirt to reassure that moisture is kept down. The vapor barrier will be done with a 6mil plastic, which is the industry standard. The cost is done on square footage.)

Rate

$0.50

Qty

2951

%

0%

Amount

$1,475.50

Task 8.0

Install New Batt Insulation (Insulation R-value will be determined by the standard that Idaho has set for various areas of the home and the region of the state signified through the IDAHO ENERGY CONSERVATION CODES. This is done on a square footage calculation.)

Rate

$3.78

Qty

2951

%

0%

Amount

$11,154.78

Task 9.0

Clearance evaluation by a 3rd party to reassure that all work performed has past the industry standard so Boise Mold Removal can provide a three year warranty.

Rate

$450

Qty

1

%

0%

Amount

$450

Yet to be Approved Estimates

Info & Notes

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Estimate is Expired

Estimate History

Viewed 416 days ago

Estimate viewed by Tylor Desilet (Tylor.D) for the first time.

Status Update 415 days ago

Status changed: Draft to Pending.

Viewed 412 days ago

Estimate viewed by 68.183.60.34 for the first time.

Viewed 407 days ago

Estimate viewed by for the first time.

Viewed 405 days ago

Estimate viewed by 68.183.149.129 for the first time.

Viewed 389 days ago

Estimate viewed by 149.202.88.65 for the first time.

Viewed 338 days ago

Estimate viewed by 68.183.157.22 for the first time.

Viewed 290 days ago

Estimate viewed by 54.146.85.143 for the first time.

Viewed 192 days ago

Estimate viewed by 2a03:2880:ff:d::face:b00c for the first time.

Viewed 188 days ago

Estimate viewed by 2a03:2880:22ff:b::face:b00c for the first time.

Viewed 183 days ago

Estimate viewed by 2a03:2880:13ff:a::face:b00c for the first time.

Viewed 169 days ago

Estimate viewed by 68.183.60.80 for the first time.

Viewed 155 days ago

Estimate viewed by 68.183.149.30 for the first time.

Viewed 148 days ago

Estimate viewed by 168.119.141.170 for the first time.

Viewed 141 days ago

Estimate viewed by 134.209.42.109 for the first time.