Estimate viewed by Tylor Desilet (Tylor.D) for the first time.
**Demo**
Removal of old shower
Removal of old lights
Pulling vanity to build up height
Price Before Additions 0
(Additional Work: Demoed ceiling around shower to raise height)
**Demo**
Removal of old shower
Removal of old lights
Pulling vanity to build up height
Price Before Additions 0
(Additional Work: Demoed ceiling around shower to raise height)
New Shower Install
**Tile Pan and Tile to Ceiling (Extended approximately a foot wider):**
– **Install Waterproofing and Pan** This requires tying into the pre-existing drain-line with drain located in the center.
– **Task Details:** Installing tiles on floor to drain properly. Install tiles from floor level up to the ceiling in the shower area.
– **Considerations:** Waterproofing, tile pattern, grout color.
– **Curbed Shower Build:**
– **Task Details:** Constructing a shower area with a low barrier (curb), installing shower base, tiling.
– **Considerations:** Drainage slope, accessibility.
**Bench Installation:**
– **Task Details:** Building a fixed bench within the shower area for seating or soaps.
-(Added New On This Bid*** 1 shower niche***)
– **Considerations:** Material, water resistance.
**Shower Handles:**
– **Task Details:** Installing grab bars and controls for shower use.
– **Considerations:** Safety, ADA compliance, material finish.
**Fixtures Installed**
– ** Shower Fixture** Fixtures will have extra handle for client to use.
We will also paint whole bathroom
Price Before Addition: 3962
(Additional Work: We added tile for the raised ceiling and for the vanity side)
Lighting (Can Lights)
– ** Replace old lighting with can lighting and 1 light**
Light will be like the other bathroom light located in the shower.
**Vanity Area**
**Granite Countertops:**
– **Task Details:** Measuring the area, selecting a granite slab, cutting, polishing, and installing.
– **Considerations:** Edge style, thickness, and sealing for protection.
**Vanity Adjustment:**
– **Task Details:** Modifying existing vanity dimensions or features to fit new elements. We will have to adjust plumbing as well for height change.
– **Considerations:** Matching or blending finishes with new components.
**Sink Replacement:**
– **Task Details:** Removing the old sink, choosing new sink style, installation, and reconnection of plumbing.
– **Considerations:** Single or double sink, material (porcelain, glass, stone).
**Tile Backsplash:**
– **Task Details:** Selecting tiles, preparing the wall surface, cutting and applying tiles with adhesive.
– **Considerations:** Design style, color, and material choice—ceramic, porcelain.
**Fixtures (Sink):**
– **Task Details:** Selecting and installing faucets with proper fittings.
– **Considerations:** Finish (chrome, brass, nickel), water efficiency, and style.
(Additional Info: Backsplash tile cost was a wash with the cost for the backsplash piece and cuts)
Add New Customer Preference Baseboard in Bathroom. Painted to match home.
Patched 2 holes in the home and skim coated the wall by the light switch, the wall to the right of the tub and the wall under the area where the mirror was. Also had to build up header area to look appealing with it being off.
Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.
We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.
Please take a chance to review your estimate and click accept. For payments over $1000.00, we require 50% of the payment. The price is subject to change if scope of work increases.
Estimate viewed by Tylor Desilet (Tylor.D) for the first time.
Status changed: Draft to Pending.
Estimate viewed by 184.155.15.186 for the first time.
Estimate viewed by 136.22.129.7 for the first time.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate viewed by for the first time.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate viewed by 66.249.79.161 for the first time.
Estimate viewed by 83.99.151.67 for the first time.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate viewed by 83.99.151.65 for the first time.
Estimate viewed by 83.99.151.71 for the first time.
Estimate viewed by 83.99.151.66 for the first time.
Estimate updated by Tylor.D.
Status changed: Pending to Approved.
Invoice Created: 19831.