**Initial Assessment and Setup* (waived if we proceed with the job)
**Initial Assessment and Setup* (waived if we proceed with the job)
Mitigation Cost
**Containment Setup** (We set up containment barriers to prevent dust and debris from spreading during work.)
**Air Scrubber** (**Air Quality Management**)
**Dehumidifier** (We will use an air scrubber and dehumidifier to ensure a clean and dry environment.)
**Removal of Baseboard and Window Trim** (We will remove the window trim to get the wall completely opened up.)
**Drywall Removal** (9′ x 10′) (We will safely remove the damaged drywall to prepare for replacement.)
**Removal of Insulation in the wall**
**Demo Pillar to Expose Water Damage behind Stucco**
**Demo Roof Shingles at the Edge of the Home to Place the Proper Flashing in the Corner.** (This will require getting the roof to the roof sheathing on this corner.)
**Antimicrobial Treatment** (We will treat affected areas to prevent mold growth. on the pillar area, in the attic and on the lumber on the exposed wall)
**PPE** (Personal Protective Equipment. Protective equipment will be used for safety.)
**Dump Fee** (Covers waste disposal from the project.)
Reconstruction Cost
**Replacement of Drywall** (New drywall will be installed to replace any removed material.)
**Applying Tape and Mud the Wall** (Taping and mudding will be applied for a smooth finish on the drywall.)
**Texturing the Drywall** (We will apply texture to the drywall for aesthetic purposes.)
**New Baseboard and Window Trim** (Includes painting, caulking and install)
**Wall Painting** (The walls will also be painted to match the new work. The whole wall will need painted.)
**Insulation Work** (Any insulation will be assessed and replaced as needed. R-13 Fiberglass. Includes vapor barrier)
**Kickout Flashing Installation** (We will install kickout flashing to improve drainage and prevent water damage. This will require matching singles and flashing to be properly installed.)
**Replacement Stucco to Proper Color and Style Texture)
**Orange Peel Texture** (This will be applied to give a uniform look to the walls.)
**Final Cleanup**
**Military Discount** (5% discount)
Scope of Work:
Initial Assessment and Setup: On-site evaluation of water damage.
Water Mitigation Services: Water extraction and drying via industrial-grade equipment brought by our team.
Drywall Replacement: Removal and disposal of damaged drywall (9′ x 10′).
Baseboard and Insulation: Removal and replacement of approximately 10′ of baseboard.
Minor Attic Remediation: Assessment and minor remediation of the affected area in the attic.
Roof Repairs: Installation of kickout flashing, including the removal of shingles.
Stucco Pillar Restoration: Open and remove stucco from pillar (2’ x 12’ on each of 4 sides).
Wall Preparation and Finishing: Taping, mudding, texturing, and painting of the new drywall.
Protective Measures: Floor protection throughout the project duration.
Monitoring and Logging: Dry log monitoring to track moisture levels and ensure proper drying.
Dump Fee: Disposal fee for removed materials.
PPE for Mold Remediation: PPE supplies for 2 people for 1 day.
Please take a chance to review your estimate and click accept. For payments over $1000.00, we require 50% of the payment. The price is subject to change if scope of work increases.
We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.
Estimate viewed by Tylor Desilet (Tylor.D) for the first time.
Status changed: Draft to Pending.
Estimate viewed by 2607:fb90:b7a1:8418:8c6d:c4cb:8c09:ed89 for the first time.
Estimate viewed by 72.24.216.58 for the first time.