Status changed: Pending to Draft.
Removal of Drywall. This is for a max 3ft. flood cut throughout the whole storage area. (Drywall is removed at times to expose areas where remediation is to take place. This price includes the disposal as well.)
Removal of Drywall. This is for a max 3ft. flood cut throughout the whole storage area. (Drywall is removed at times to expose areas where remediation is to take place. This price includes the disposal as well.)
Removal of batt insulation. This is for a max 3ft. flood cut throughout the whole storage area. (This includes bagging up the insulation and disposing of it. IICRC certification requires all mold remediation companies to remove insulation when the growth is over 10sqft. This is a square footage calculation.)
HEPA vacuuming. This is for a max 3ft. flood cut throughout the whole storage area. (HEPA vacuuming is a process of pulling all contaminates off a surface area. This process eliminates mold particles from a surface area with specific vacuums without contaminating the air quality of a livable space. HEPA vacuuming is normally done before and after to reassure no particles are in the space that was contaminated).
Treatment with anti-microbial solution. This is for a max 3ft. flood cut throughout the whole storage area.(Treatment is performed with an anti-microbial solution that eliminates and prevents future growth. All treatment is warrantied for 3yrs. unless Boise Mold Removal does not provide a warranty under the stipulations of the client not solving the underlying issue that caused the growth in the first place.)
PPE (Personal Protective Equipment) (This is safety equipment for our techs to wear during remediation practices. This is a per person per day basis. There will need to be new PPE every day for proper safety. This includes the Tyvek suits, gloves, and any filters per the duration of the job).
Add drying equipment (An air mover is designed to dry out areas where moisture has occurred. The equipment will run the duration of the job until the moisture content has hit the IICRC’s standards for an acceptable level. This is a bigger unit and is charged on a per day basis)
Additional time invested: planning and zoning, correspondence with Public works office, client for restoration, and excavation companies for potential change order for additional work scope
Please take a chance to review your estimate and click accept. For payments over $1000.00, we require 50% of the payment. The price is subject to change if scope of work increases.
We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.
Status changed: Pending to Draft.
Status changed: Draft to Pending.
Invoice viewed by 2601:282:4400:7ac0:25df:596:5406:1eec for the first time.
Invoice viewed by 66.249.66.6 for the first time.
Invoice viewed by 68.183.60.80 for the first time.
Invoice viewed by 68.183.60.34 for the first time.
Invoice viewed by 68.183.149.30 for the first time.
Invoice viewed by 168.119.141.170 for the first time.
Invoice viewed by 134.209.42.109 for the first time.
Invoice updated by Tylor.D.
Invoice updated by Tylor.D.
Invoice updated by Tylor.D.
Admin Payment - Added By: tylor-dPayment Total: $3,755.00
Status changed: Pending to Outstanding Balance.
Invoice updated by Tylor.D.
Invoice updated by Tylor.D.
Invoice updated by Tylor.D.
Admin Payment - Added By: tylor-dPayment Total: $1,455.00
Status changed: Pending to Paid.