Status changed: Pending to Draft.
Removal of blow-in insulation in the attic. (IICRC certification requires all mold remediation companies to remove insulation when the growth is over 10sqft. This is a square footage calculation.)
Insulation will need to be removed because the current insulation is covering the areas of lumber that need cleaned.