Task 1.0

Job Description: Crawlspace Foundation Perimeter Reinforcement and Concrete Pouring

Project Overview:
This project involves structural reinforcement and concrete pouring around the perimeter of a crawlspace area measuring 2,287 square feet. The work will focus on digging trenches around the foundation (except for the front where the garage and concrete patio are), reinforcing the perimeter of the foundation with a custom concrete mixture, and addressing cracks with construction epoxy that allow water intrusion.

Job Scope:

  1. Excavation & Trenching:
    • Digging trenches around the entire perimeter of the foundation (excluding the front section where the garage and patio are located).
    • Trenches will be dug carefully to ensure they are positioned properly for optimal foundation support and repelling water from penetrating the soil under the existing foundation and entering the crawlspace.
  2. Reinforcement & Material Preparation:
    • Cinder bricks will be laid along one side of the entire trench perimeter for structural support.
    • A specially mixed concrete will be prepared with additional substances to increase density and ensure proper adhesion to the foundation. This mixture will also support long-term durability and prevent water-related issues.
  3. Concrete Pouring & Form Construction:
    • Forms will be constructed around the trench perimeter to ensure uniform and consistent shape for the concrete.
    • The reinforced concrete will be poured around the perimeter of the foundation, covering the cold joint of the foundation and the underside of the structure.
    • Horizontal fiberglass rebar and dowels into the existing foundation will be included in the construction of the concrete.
  4. Crack Repair & Sealing:
    • All visible cracks in the foundation will be grinded and prepped to provide a clean surface for applying structural epoxy.
    • Structural epoxy will be injected into the cracks to seal them, preventing moisture from entering the crawlspace and foundation.

Duration & Timeline:

  • The estimated time for project completion is 10 days, depending on the curing time for the concrete and weather conditions.

Expected Outcome:
By the end of the project, the forms will be removed, the foundation perimeter will be reinforced with a durable, properly mixed concrete that prevents water penetration and provides added stability. The cracks will be sealed, and the crawlspace will be protected from future water-related issues.

Rate

$12,500

Qty

1

Amount

$12,500

Total Owed

Info & Notes

Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Balance of $12,500.00 is Overdue Make a Deposit Payment

Make a Payment

Select your payment amount below.

Deposit due $5,000.00
Current balance $12,500.00

Please select your payment type and enter your payment information to pay this invoice. A receipt for your records will be sent to you. Thank you very much!

Invoice History

Viewed 349 days ago

Invoice viewed by 83.99.151.68 for the first time.

Viewed 343 days ago

Invoice viewed by 83.99.151.71 for the first time.

Viewed 340 days ago

Invoice viewed by 83.99.151.66 for the first time.

Viewed 300 days ago

Invoice viewed by 83.99.151.67 for the first time.

Viewed 274 days ago

Invoice viewed by 196.240.105.251 for the first time.

Viewed 268 days ago

Invoice viewed by 83.99.151.69 for the first time.

Viewed 245 days ago

Invoice viewed by 98.85.82.111 for the first time.

Viewed 234 days ago

Invoice viewed by 54.161.167.20 for the first time.

Viewed 64 days ago

Invoice viewed by 83.99.206.64 for the first time.

Viewed 58 days ago

Invoice viewed by 83.99.206.178 for the first time.

Viewed 57 days ago

Invoice viewed by 108.141.166.46 for the first time.

Viewed 56 days ago

Invoice viewed by 189.76.222.46 for the first time.

Viewed 54 days ago

Invoice viewed by 83.99.206.48 for the first time.

Viewed 52 days ago

Invoice viewed by 202.76.162.238 for the first time.

Viewed 51 days ago

Invoice viewed by 83.99.206.166 for the first time.

Viewed 51 days ago

Invoice viewed by 2001:ee0:4c61:5c45:c4cd:91fb:d056:6e37 for the first time.

Viewed 44 days ago

Invoice viewed by 83.99.206.81 for the first time.

Viewed 36 days ago

Invoice viewed by 83.99.206.217 for the first time.

Viewed 31 days ago

Invoice viewed by 83.99.206.90 for the first time.

Viewed 29 days ago

Invoice viewed by 83.99.206.44 for the first time.

Viewed 23 days ago

Invoice viewed by 83.99.206.151 for the first time.

Viewed 19 days ago

Invoice viewed by 83.99.206.209 for the first time.

Viewed 18 days ago

Invoice viewed by 83.99.206.45 for the first time.

Viewed 14 days ago

Invoice viewed by 83.99.206.98 for the first time.

Viewed 11 days ago

Invoice viewed by 83.99.206.1 for the first time.

Viewed 6 days ago

Invoice viewed by 83.99.206.177 for the first time.

Viewed 4 days ago

Invoice viewed by 83.99.206.73 for the first time.

Viewed 1 day ago

Invoice viewed by 83.99.206.254 for the first time.