Issued: December 17, 2025 by:

Boise Mold Removal

Tylor Desilet
PO Box 785
Caldwell, ID 83606
US
Due:

December 31, 2025

Payment Pending

Task 1.0

FRENCH DRAIN SYSTEM

Exterior French Drain System (Approx. 30 LF)

Layout OSB in the yard no there’s no damaged areas. 

Layout and mark drain line approx. 30 linear feet along perimeter of house where water is intruding.

Excavate trench to appropriate depth and slope. Needs to go to foundation footer to reassure water doesn’t enter.

Remove old drain (Is poorly designed)

Install filter fabric, 4″ perforated drain pipe, and washed drain rock.

Tie drain line into collection basin.

Backfill and rough grade disturbed areas.

Includes sealing the foundation with sealant

Collection Basin & Rock Cover

Connect French drain line(s) into basin area.

Backfill and install dirt back in.

Tie in existing gutter downspouts to the french drain

Repair any sprinkler areas that might be harmed in the area.

Rate

$8,500

Qty

1

Amount

$8,500

Task 2.0

CRAWLSPACE

Crawlspace Drying – Localized Wet Corner

Access crawlspace and set containment as needed around affected corner.

Deploy drying equipment (air movers and dehumidifier) focused on localized wet area only.

Remove equipment after drying is complete.

New Crawlspace Vapor Barrier. Remove and dispose of existing compromised vapor barrier. Install new 6-mil polyethylene vapor barrier across crawlspace.

Overlap seams, run up foundation walls where accessible, and wrap.

Rate

$1,050

Qty

1

Amount

$1,050

Total Owed

Info & Notes

Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Balance of $9,550.00 is Overdue Make a Deposit Payment

Make a Payment

Oh no! So sorry. There are no payment options available for you to make a payment. Please let me know so I can figure out why.

Invoice History

Status Update 86 days ago

Status changed: Pending to Draft.

Status Update 86 days ago

Status changed: Draft to Pending.

Viewed 86 days ago

Invoice viewed by 174.126.239.249 for the first time.

Viewed 83 days ago

Invoice viewed by 2607:fb90:b70d:9156:8160:c6a0:c95b:1726 for the first time.

Viewed 65 days ago

Invoice viewed by 83.99.206.109 for the first time.

Viewed 59 days ago

Invoice viewed by 83.99.206.98 for the first time.

Viewed 58 days ago

Invoice viewed by 108.141.166.46 for the first time.

Viewed 56 days ago

Invoice viewed by 83.99.206.100 for the first time.

Viewed 54 days ago

Invoice viewed by 146.174.176.174 for the first time.

Viewed 52 days ago

Invoice viewed by 181.115.130.6 for the first time.

Viewed 50 days ago

Invoice viewed by 83.99.206.151 for the first time.

Viewed 50 days ago

Invoice viewed by 186.84.88.178 for the first time.

Viewed 45 days ago

Invoice viewed by 83.99.206.1 for the first time.

Viewed 38 days ago

Invoice viewed by 83.99.206.222 for the first time.

Viewed 32 days ago

Invoice viewed by 83.99.206.10 for the first time.

Viewed 29 days ago

Invoice viewed by 83.99.206.225 for the first time.

Viewed 25 days ago

Invoice viewed by 83.99.206.241 for the first time.

Viewed 20 days ago

Invoice viewed by 83.99.206.90 for the first time.

Viewed 12 days ago

Invoice viewed by 83.99.206.230 for the first time.

Viewed 6 days ago

Invoice viewed by 83.99.206.209 for the first time.

Viewed 1 day ago

Invoice viewed by 83.99.206.250 for the first time.