Status changed: Pending to Draft.
Demo of the old wall in the master bathroom
Demo of the old wall in the master bathroom
Moving the master bathroom wall to load bearing wall.
Demo of the existing master bathroom linen closet
Moving closet door jams to be in line with bathroom door jams 10”. Includes moving switches.
Upgrade to cabinets and counter in the master bathroom.
Additional tile cost for the shower walls. It will go to the ceiling now.
Additional tile cost for the master bathroom extension
Upgrade to square trim and door casing for full remodel. MDF
Moving and updating existing guest bathroom plumbing, dryer line, electrical and HVAC to accommodate new design and build up to current codes. (Dryer line will need to be hard-lined horizontally through the second floor to the exterior of the side of the home with a proper vent. Moving existing and adding registers in the guest bathroom and master closet to accommodate according.)
Building guest bathroom shower wall. This includes cost taken off from Barlett’s cost.
Demo of the loadbearing wall in guest bathroom area
Install of engineered header in the location of the demoed loadbearing wall. Including faux wood beam cover.
Install linen cabinet in guest bathroom extension.
Building of guest bathroom closet facing wall. This includes cost taken off from Barlett’s cost.
Design and construction of cabinets and open shelving on guest bathroom closet facing wall.
Extra tile in the guest bathroom area.
Extra tile in the guest bathroom tub and toilet area extension
Insulate extra walls not covered by Bartlett and lower section of master bathroom plumbing areas.
Moving and updating existing guest bathroom plumbing, dryer line, electrical and HVAC to accommodate new design and build up to current codes. (Dryer line will need to be hard-lined horizontally through the second floor to the exterior of the side of the home with a proper vent. Moving existing and adding registers in the guest bathroom and master closet to accommodate according.)
Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.
We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.
Please take a chance to review your estimate and click accept. For payments over $1000.00, we require 50% of the payment. The price is subject to change if scope of work increases.
Oh no! So sorry. There are no payment options available for you to make a payment. Please let me know so I can figure out why.
Status changed: Pending to Draft.
Status changed: Draft to Pending.
Invoice updated by Tylor.D.
Invoice viewed by 83.99.151.71 for the first time.
Invoice viewed by 83.99.151.67 for the first time.
Invoice viewed by 83.99.151.70 for the first time.
Invoice viewed by 83.99.151.69 for the first time.
Invoice viewed by 83.99.151.65 for the first time.
Invoice viewed by 170.254.122.2 for the first time.
Invoice viewed by 38.191.187.67 for the first time.
Invoice viewed by 45.238.39.77 for the first time.
Invoice viewed by 138.59.195.29 for the first time.
Invoice viewed by 2001:ee0:5706:b325:24:caeb:34e1:4c67 for the first time.
Invoice viewed by 177.85.193.124 for the first time.
Invoice viewed by 2001:ee0:7726:2b5d:42a:bb2:ecc4:ab22 for the first time.
Invoice viewed by 2001:ee0:4b41:e961:24b2:721:d8e4:7365 for the first time.
Invoice viewed by 2001:ee0:4294:86bf:d129:5868:3ece:b09a for the first time.
Invoice viewed by 2001:ee0:51c1:826d:7972:3dd5:4bd1:7609 for the first time.
Invoice viewed by 177.53.215.226 for the first time.
Invoice viewed by 179.189.138.64 for the first time.
Invoice viewed by 2001:ee0:4b51:eab9:1f4:a4f1:e9ca:84f5 for the first time.
Invoice viewed by 181.13.10.7 for the first time.
Invoice viewed by 201.75.189.165 for the first time.
Invoice viewed by 201.11.202.203 for the first time.
Invoice viewed by 201.3.164.141 for the first time.
Invoice viewed by 2001:ee0:4501:c771:9492:bed5:d28e:6309 for the first time.
Invoice viewed by 103.175.222.239 for the first time.
Invoice viewed by 177.23.41.3 for the first time.
Invoice viewed by 168.232.85.84 for the first time.
Invoice viewed by 177.195.148.112 for the first time.
Invoice viewed by 83.99.206.100 for the first time.
Invoice viewed by 83.99.206.253 for the first time.
Invoice viewed by 108.141.166.46 for the first time.
Invoice viewed by 146.174.180.149 for the first time.
Invoice viewed by 83.99.206.96 for the first time.
Invoice viewed by 45.189.221.11 for the first time.
Invoice viewed by 83.171.206.107 for the first time.
Invoice viewed by 185.139.137.61 for the first time.
Invoice viewed by 83.99.206.105 for the first time.
Invoice viewed by 83.99.206.167 for the first time.
Invoice viewed by 83.99.206.1 for the first time.
Invoice viewed by 83.99.206.235 for the first time.
Invoice viewed by 83.99.206.37 for the first time.
Invoice viewed by 83.99.206.90 for the first time.
Invoice viewed by 83.99.206.151 for the first time.
Invoice viewed by 83.99.206.219 for the first time.
Invoice viewed by 83.99.206.185 for the first time.
Invoice viewed by 83.99.206.197 for the first time.