SECTION 4 — Vapor Barrier Removal & Replacement (1831 sq ft -the slab area of 700sqft.) Scope Includes:-Install new 6-mil vapor barrier -Overlap and secure seams -Wrap around posts and perimeter -Haul away old barrier and waste

$1,550.00

Category:

SECTION 4 — Vapor Barrier Removal & Replacement (1831 sq ft -the slab area of 700sqft.)
Scope Includes:

-Install new 6-mil vapor barrier
-Overlap and secure seams
-Wrap around posts and perimeter
-Haul away old barrier and waste