Flood cut whole facility at the Egg Factory, this was every wall that had taken on water. Put drying equipment on all these areas. Disposed of all material. Treated all areas throughout the whole facility. Took apart bathrooms to clean adequately.

$11,000.00

Category:

Flood cut whole facility at the Egg Factory, this was every wall that had taken on water. Put drying equipment on all these areas. Disposed of all material. Treated all areas throughout the whole facility. Took apart bathrooms to clean adequately.