HEPA Vacuuming exposed framing w/ sheathing – Floor
HEPA Vacuuming exposed framing w/ sheathing – Floor
Sand exposed framing – Floor
Apply plant-based anti-microbial agent to the surface area
Seal the surface area with fungicidal/bacterial inhibitor – one coat
Disinfect building – fog / spray – per SF
HEPA Vacuuming exposed framing w/ sheathing – Walls
Sand exposed framing – Walls
Apply plant-based anti-microbial agent to the surface area
Seal the surface area with fungicidal/bacterial inhibitor – one coat
Confined Space Add-On
Protect – Cover with plastic
R&R Soffit & fascia – wood – 1′ overhang
R&R Drip edge
R&R Siding trim
Seal (1 coat) & paint (1 coat) trim
Paint trim – one coat
R&R Sheathing – OSB – 1/2″
R&R Batt insulation – 6″ – R19 – paper / foil faced
R&R Siding – cedar slat, 1″ x 4″ over plywood (excludes ply)
Seal & paint wood siding
R&R Window trim – 1″ x 4″
R&R Gutter / downspout – aluminum – up to 5″
Prime & paint exterior soffit – wood
Prime & paint exterior fascia – wood, 4″- 6″ wide
Residential Supervision / Project Management – per hour
Cleaning Technician – per hour
General Laborer – per hour
PPE Face Covering / Eye Protection / Suits
Dump Fees
Labor Minimums Applied Framing/Gutter/Insulation/Finish Carpentry
R&R Siding trim – 1 1/2″ x 3/4″
R&R Fascia – 1″ x 4″ – #1 pine
R&R Siding – cedar slat, 1″ x 4″ over plywood (excludes ply)
R&R Fascia – 1″ x 4″ – #1 pine
R&R Siding trim – 1″ x 2″ fir re-sawn
R&R Soffit – vinyl
R&R Sheathing – plywood – 1/2″ CDX
Ice & water barrier
R&R Corner trim
R&R Window trim – 3 1/2″ x 3/4″
R&R Window trim – 6 1/2″ x 3/4″
R&R Aluminum window, picture/fixed 12-23 sf
Add. charge for a retrofit window, 12-23 sf – difficult
R&R House wrap (air/moisture barrier)
Weather tape
Installation and materials cost of 50yr. Malarkey
Highlander Nex Shingles
50yr. Malarkey Smartstarter Strips
50yr. Malarkey Ridge
ex 12′′ Hip n Ridge Cap
2×4′′x10′ Dripedge
1 unit 4x4x12′′ Step
ashing
2 pcs 3×5′′x10′ Roof to Wall
9 Pipe Jacks 3n4
2 boxes 4’x12′′ Lomanco Ridge Vent
20 LF Intake 9′′
3 boxes 1 1/4′′ Coilnails
1 box 1 3/4′′ Coilnails
3 Boxes 1′′ p-caps
1 tube of caulk 1 can of paint
Secure Start HT Ice and Water on eves and ridge.
(This price includes labor and materials)
Please take a chance to review your estimate and click accept. For payments over $1000.00, we require 50% of the payment. The price is subject to change if scope of work increases.
We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.
Estimate viewed by Tylor Desilet (Tylor.D) for the first time.
Status changed: Draft to Pending.
Estimate viewed by for the first time.
Estimate viewed by 66.249.66.1 for the first time.
Estimate viewed by 68.183.60.80 for the first time.
Estimate viewed by 68.183.60.34 for the first time.
Estimate viewed by 68.183.149.30 for the first time.