Task 1.0

Contain area for remediation by the hatch of the crawlspace (Containment eliminates any contaminates from existing into the livable space. Without the containment also the insulation, if removed can possibly enter the livable space, kicking insulation, dirt and possible mold-like substance around. We can pull the containment after remediation has taken place. Cost is relayed on a linear foot basis)

Rate

$32

Qty

16

%

0%

Amount

$512

Task 2.0

Run air scrubber (An air scrubber is designed with a dual filtered system in an arear to eliminate any possible contaminates from going through the home. The air scrubber is ran on a daily based per the whole duration of the job.)

Rate

$75

Qty

5

%

0%

Amount

$375

Task 3.0

Dry ice blast (Dry ice blasting is used to eliminate growth on a surface areas that needs a higher abrasion technique. The dry ice blaster will freeze the growth (killing it) with dry ice rice pellets. Also this technique pulls a thin layer off the surface area that is used to strip paints, dirt and growth off any and all surface areas. This is a per square foot cost.)

Rate

$3.75

Qty

1615

%

0%

Amount

$6,056.25

Task 4.0

PPE (Personal Protective Equipment) (This is safety equipment for our techs to wear during remediation practices. This is a per person per day basis. There will need to be new PPE every day for proper safety. This includes the Tyvek suits, gloves, and any filters per the duration of the job).

Rate

$75

Qty

6

%

0%

Amount

$450

Task 5.0

HEPA vacuuming in crawlspace (HEPA vacuuming is a process of pulling all contaminates off a surface area. This process eliminates mold particles from a surface area with specific vacuums without contaminating the air quality of a livable space. HEPA vacuuming is normally done before and after to reassure no particles are in the space that was contaminated).

Rate

$1.10

Qty

1615

%

0%

Amount

$1,776.50

Task 6.0

Remove and replace vapor barrier in crawlspace (The removal of vapor barrier can be done for two reasons, one is that the vapor barrier is contaminated by the growth. Any building supplies is deemed contaminated when the contamination in an area is over 10sqft. Another reason to replace vapor barrier is that the vapor barrier is not installed properly. Improper install of vapor barrier can cause moisture issues which in turn can cause potential growth in the future. This done on a per sqft. basis).

Rate

$0.73

Qty

1615

%

0%

Amount

$1,178.95

Task 7.0

Pour approximately 16ft. x 2ft. of concrete in the bottom of the flower bed to reassure that water will not continue to seep through the floor bed. (There will need to be road mix placed in the flower bed after the rocks are removed. Then the road mix will be compacted and then concrete poured).

Rate

$16

Qty

32

%

Amount

$512

Task 8.0

Removal of batt insulation in crawlspace (This includes bagging up the insulation and disposing of it. IICRC certification requires all mold remediation companies to remove insulation when the growth is over 10sqft. This is a square footage calculation.)

Rate

$1.50

Qty

1615

%

0%

Amount

$2,422.50

Task 9.0

Install New Batt Insulation in crawlspace (Insulation R-value will be determined by the standard that Idaho has set for various areas of the home and the region of the state signified through the IDAHO ENERGY CONSERVATION CODES. This is done on a square footage calculation.)

Rate

$2.70

Qty

1615

%

0%

Amount

$4,360.50

Yet to be Approved

Info & Notes

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Estimate is Expired

Estimate History

Status Update 328 days ago

Status changed: Draft to Pending.

Viewed 328 days ago

Estimate viewed by 75.174.117.105 for the first time.

Viewed 327 days ago

Estimate viewed by 136.226.54.190 for the first time.

Viewed 316 days ago

Estimate viewed by for the first time.

Viewed 261 days ago

Estimate viewed by 68.183.60.80 for the first time.

Viewed 254 days ago

Estimate viewed by 68.183.60.34 for the first time.

Viewed 247 days ago

Estimate viewed by 68.183.149.30 for the first time.

Viewed 240 days ago

Estimate viewed by 168.119.141.170 for the first time.

Viewed 233 days ago

Estimate viewed by 134.209.42.109 for the first time.

Viewed 224 days ago

Estimate viewed by 212.102.41.14 for the first time.

Viewed 41 days ago

Estimate viewed by 129.226.131.165 for the first time.

Viewed 31 days ago

Estimate viewed by 83.99.151.65 for the first time.

Viewed 24 days ago

Estimate viewed by 83.99.151.71 for the first time.

Viewed 11 days ago

Estimate viewed by 47.79.2.24 for the first time.

Viewed 4 days ago

Estimate viewed by 83.99.151.67 for the first time.