Estimate updated by Tylor.D.
Blow-in insulation into attic (The attic currently has blow-in insulation, we will be blowing in an addition 6”-8” in the areas that are higher and bringing all areas up to the same height.)
Blow-in insulation into attic (The attic currently has blow-in insulation, we will be blowing in an addition 6”-8” in the areas that are higher and bringing all areas up to the same height.)
Scope of Work:
Initial Assessment and Setup: On-site evaluation of water damage.
Water Mitigation Services: Water extraction and drying via industrial-grade equipment brought by our team.
Drywall Replacement: Removal and disposal of damaged drywall (9′ x 10′).
Baseboard and Insulation: Removal and replacement of approximately 10′ of baseboard.
Minor Attic Remediation: Assessment and minor remediation of the affected area in the attic.
Roof Repairs: Installation of kickout flashing, including the removal of shingles.
Stucco Pillar Restoration: Open and remove stucco from pillar (2’ x 12’ on each of 4 sides).
Wall Preparation and Finishing: Taping, mudding, texturing, and painting of the new drywall.
Protective Measures: Floor protection throughout the project duration.
Monitoring and Logging: Dry log monitoring to track moisture levels and ensure proper drying.
Dump Fee: Disposal fee for removed materials.
PPE for Mold Remediation: PPE supplies for 2 people for 1 day.
Please take a chance to review your estimate and click accept. For payments over $1000.00, we require 50% of the payment. The price is subject to change if scope of work increases.
We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate viewed by for the first time.
Estimate viewed by Tylor Desilet (Tylor.D) for the first time.
Estimate viewed by 83.99.151.67 for the first time.
Estimate viewed by 83.99.151.71 for the first time.
Estimate viewed by 83.99.151.69 for the first time.