Estimate

Task 1.0

### Demolition

1. **Disconnect and Remove Pool Connections**: Removal of all electrical or plumbing connections to the pool, essential for safe demolition.

2. **Debris Removal and Disposal**: Labor cost for physically removing debris from the site.

3. **Dumpster Rental and Disposal Fees**: Rental of a dumpster for debris disposal.

4. **Remove Seam Trim Pieces**: Labor for removing trim pieces along seams.

5. **Remove Corner Trim Pieces**: Labor for removing trim pieces at corners.

6. **Remove Door Trim**: Labor for removing the trim around doors.

7. **Remove Drywall – Walls and Ceiling**: Labor for demolishing drywall from walls and ceilings.

8. **Drywall Demo Debris Removal**: Removing the debris created from drywall demolition.

9. **Remove Carpet Tiles**: Labor for removing any tile flooring.

10. **Carpet Adhesive Removal**: Labor for removing adhesive left from carpet tiles.

11. **Floor Cleaning and Prep**: Cleaning and preparing the floor for new installations.

12. **Remove Existing Baseboards**: Labor for removing baseboards.

13. **Remove Existing Wall Insulation**: Labor for removing current wall insulation.

14. **Insulation Disposal**: Disposal of old insulation materials.

Rate

$4,677.20

Qty

1

Amount

$4,677.20

Task 2.0

### Siding

1. **Composite Siding Removal**: Labor for removing existing composite siding.

2. **Horizontal Siding Material**: Cost of new horizontal siding material.

3. **Horizontal Siding Installation**: Labor for installing new horizontal siding.

4. **Siding Fasteners**: Fasteners required for sidings, like nails or screws.

5. **House Wrap**: Material used as a moisture barrier under the siding.

6. **House Wrap Installation**: Labor for installing house wrap.

Rate

$8,206

Qty

1

Amount

$8,206

Task 3.0

### Electrical

1. **Isolate Electrical Boxes**: Labor for isolating and ensuring electrical boxes are safe during demolition.

2. **Wire Nuts**: Cost of wire nuts used to connect electrical wires.

3. **Electrical Tape**: Tape for insulating electrical connections.

4. **Electrical Labor**: Labor cost for electrical work involved.

5. **Disconnect Electrical Boxes**: Labor for safely disconnecting electrical boxes.

6. **Reinstall Electrical Boxes**: Labor for reinstalling electrical boxes post-renovation.

Rate

$1,389.26

Qty

1

Amount

$1,389.26

Task 4.0

### Trim

1. **Seam Trim Pieces**: Material cost for new pieces that cover the seams.

2. **Corner Trim Pieces**: Material cost for decorative trim at corners.

3. **Install New Trim Pieces**: Labor for installing new trim.

4. **Door Trim Material**: Cost for trimming materials specifically for doors.

5. **Install Door Trim**: Labor for installing door trims.

6. **MDF Baseboards**: Material cost for baseboards.

7. **Baseboard Installation**: Labor for installing baseboards.

8. **Baseboard Nails**: Fasteners for securing baseboards.

9. **Baseboard Caulk**: Caulking material used to seal gaps around baseboards.

Rate

$1,728.10

Qty

1

Amount

$1,728.10

Task 5.0

### Soffit

1. **Remove Existing Soffit**: Labor for demolishing existing soffit overhangs.

2. **2ft Soffit Board**: Cost for new soffit board material.

3. **Soffit Installation Labor**: Labor cost for installing new soffit material.

4. **Soffit Fasteners**: Fasteners required for securing soffit boards.

Rate

$2,062.50

Qty

1

Amount

$2,062.50

Task 6.0

### Drywall

1. **1/2 inch Drywall Material**: Cost of new drywall sheets.

2. **Drywall Installation Labor**: Labor for installing drywall.

3. **Joint Compound**: Material used for sealing joints between drywall sheets.

4. **Drywall Tape**: Used to strengthen joints in drywall.

5. **Drywall Screws**: Fasteners for attaching drywall sheets.

6. **Texture Material**: Material used to add texture to drywall.

7. **Apply Texture**: Labor for applying texture to walls.

Rate

$2,003.10

Qty

1

Amount

$2,003.10

Task 7.0

### Paint

1. **Interior Paint**: Cost of paint for interior surfaces.

2. **Paint Labor**: Labor for applying paint.

3. **Prime and Paint Baseboards**: Labor for priming and painting baseboards.

4. **Primer**: Primer material for surfaces before painting.

5. **Exterior Paint for Siding**: Cost for painting the exterior siding.

6. **Exterior Paint for Soffit**: Cost for painting the soffit.

7. **Exterior Painting Labor – Siding**: Labor for painting siding.

8. **Exterior Painting Labor – Soffit**: Labor for painting soffit.

9. **Exterior Primer**: Primer material for exterior surfaces.

10. **Interior Paint for Drywall**: Cost of paint for drywall.

11. **Interior Painting Labor – Drywall**: Labor for painting drywall.

12. **Interior Paint for Trim**: Cost of paint for trim.

13. **Interior Painting Labor – Trim**: Labor for painting trim.

14. **Paint Supplies**: Supplies needed for painting, such as brushes, rollers, and tape.

Rate

$4,917

Qty

1

Amount

$4,917

Task 8.0

### Waterproofing

1. **Concrete Sealant Material**: Cost for sealant to waterproof concrete.

2. **Concrete Sealant Application**: Labor for applying the sealant.

3. **Runner Board Material**: Cost for material used for runner boards, often used at the threshold.

4. **Runner Board Installation**: Labor for installing runner boards.

5. **Fasteners and Anchors**: Miscellaneous fasteners used.

Rate

$2,744.50

Qty

1

Amount

$2,744.50

Task 9.0

### Mold Remediation

1. **Industrial Dehumidifier Rental**: Cost for renting a dehumidifier to remove moisture.

2. **Air Scrubber Rental**: Cost for renting equipment to cleanse the air of mold particles.

3. **Antimicrobial Treatment Solution**: Cost for a specialized solution to combat mold.

4. **PPE Equipment Set**: Personal protective equipment for workers.

5. **Containment Materials**: Materials for isolating affected areas during remediation.

6. **Mold Treatment Application**: Labor for applying treatments to eliminate mold.

**Total Mold Remediation: $3,668.50**

Rate

$3,668.50

Qty

1

Amount

$3,668.50

Task 10.0

### Insulation

1. **R-19 Fiberglass Batt Insulation**: Cost for high-efficiency insulation panels.

2. **Insulation Installation Labor**: Labor for installing insulation.

3. **Vapor Barrier**: Barrier material to prevent moisture from entering walls.

4. **Vapor Barrier Installation**: Labor for installing vapor barriers.

Rate

$3,080

Qty

1

Amount

$3,080

Yet to be Approved

Info & Notes

Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Estimate is Expired

Estimate History

Status Update 376 days ago

Status changed: Draft to Pending.

Viewed 376 days ago

Estimate viewed by for the first time.

Viewed 374 days ago

Estimate viewed by 66.249.65.168 for the first time.

Viewed 374 days ago

Estimate viewed by 66.249.65.167 for the first time.

Viewed 373 days ago

Estimate viewed by 83.99.151.71 for the first time.

Viewed 369 days ago

Estimate viewed by 83.99.151.69 for the first time.

Viewed 281 days ago

Estimate viewed by 181.226.205.88 for the first time.

Viewed 277 days ago

Estimate viewed by 2001:ee0:51c4:97cc:395b:f685:86f0:417d for the first time.

Viewed 276 days ago

Estimate viewed by 2001:ee0:4f39:820e:1038:d5e:9b28:399d for the first time.

Viewed 275 days ago

Estimate viewed by 2001:ee0:495f:2b66:bd86:eb1e:c39a:d41e for the first time.

Viewed 273 days ago

Estimate viewed by 179.108.174.21 for the first time.

Viewed 272 days ago

Estimate viewed by 45.229.143.24 for the first time.

Viewed 270 days ago

Estimate viewed by 14.169.144.174 for the first time.

Viewed 266 days ago

Estimate viewed by 186.23.28.75 for the first time.

Viewed 263 days ago

Estimate viewed by 177.37.136.217 for the first time.

Viewed 262 days ago

Estimate viewed by 190.5.160.66 for the first time.

Viewed 261 days ago

Estimate viewed by 179.94.204.85 for the first time.

Viewed 259 days ago

Estimate viewed by 201.19.131.19 for the first time.

Viewed 258 days ago

Estimate viewed by 45.70.58.13 for the first time.

Viewed 257 days ago

Estimate viewed by 177.74.65.71 for the first time.

Viewed 254 days ago

Estimate viewed by 38.191.205.171 for the first time.

Viewed 252 days ago

Estimate viewed by 179.189.60.125 for the first time.

Viewed 250 days ago

Estimate viewed by 177.128.83.127 for the first time.

Viewed 249 days ago

Estimate viewed by 2001:ee0:4d61:c8db:a4d3:bc87:8440:53d3 for the first time.

Viewed 246 days ago

Estimate viewed by 143.255.143.46 for the first time.

Viewed 245 days ago

Estimate viewed by 2001:ee0:4255:e192:354f:71e8:4dba:bca4 for the first time.

Viewed 242 days ago

Estimate viewed by 201.68.59.203 for the first time.

Viewed 241 days ago

Estimate viewed by 2001:ee0:4f33:ac6c:55d5:2c5a:3cd8:82aa for the first time.

Viewed 238 days ago

Estimate viewed by 114.10.42.160 for the first time.

Viewed 236 days ago

Estimate viewed by 2001:ee0:4328:8073:8552:9b0:1d26:448 for the first time.

Viewed 183 days ago

Estimate viewed by 202.76.140.119 for the first time.

Viewed 179 days ago

Estimate viewed by 202.76.167.165 for the first time.

Viewed 168 days ago

Estimate viewed by 83.99.206.37 for the first time.

Viewed 163 days ago

Estimate viewed by 83.99.206.138 for the first time.

Viewed 158 days ago

Estimate viewed by 83.99.206.100 for the first time.

Viewed 156 days ago

Estimate viewed by 83.99.206.84 for the first time.

Viewed 145 days ago

Estimate viewed by 83.99.206.241 for the first time.

Viewed 136 days ago

Estimate viewed by 83.99.206.197 for the first time.

Viewed 133 days ago

Estimate viewed by 83.99.206.219 for the first time.

Viewed 128 days ago

Estimate viewed by 83.99.206.94 for the first time.

Viewed 124 days ago

Estimate viewed by 83.99.206.98 for the first time.

Viewed 119 days ago

Estimate viewed by 83.99.206.142 for the first time.

Viewed 115 days ago

Estimate viewed by 83.99.206.235 for the first time.

Viewed 112 days ago

Estimate viewed by 83.99.206.151 for the first time.

Viewed 108 days ago

Estimate viewed by 83.99.206.135 for the first time.

Viewed 105 days ago

Estimate viewed by 83.99.206.253 for the first time.

Viewed 98 days ago

Estimate viewed by 83.99.206.73 for the first time.

Viewed 88 days ago

Estimate viewed by 83.99.206.254 for the first time.

Viewed 81 days ago

Estimate viewed by 83.99.206.90 for the first time.

Viewed 73 days ago

Estimate viewed by 83.99.206.25 for the first time.

Viewed 60 days ago

Estimate viewed by 151.244.145.232 for the first time.

Viewed 58 days ago

Estimate viewed by 14.178.151.178 for the first time.

Viewed 57 days ago

Estimate viewed by 41.99.89.59 for the first time.

Viewed 57 days ago

Estimate viewed by 14.236.26.251 for the first time.

Viewed 56 days ago

Estimate viewed by 113.179.64.66 for the first time.