Estimate viewed by Tylor Desilet (Tylor.D) for the first time.
Rebuild (Recon) Shower Costs/ Client Costs
Rebuild (Recon) Shower Costs/ Client Costs
Ceramic Wall Tile, Standard Grade (SF) 96 x $1.64.(Was 157.34 Client purchased)
GoBoard Tile Backer Board, 1/2 inch (SF) 96 x $1.98
Tile Labor for Shower
Tub (EA) 1 x $383.90 (Client Purchased was 383.90)
Tub Filler Faucet (EA) 1 x $132 (Client purchased
Tub Drain Assembly (EA) 1 x $33
Overflow Assembly (EA) 1 x $22
Water Shut-off Valve (EA) 1 x $27.47
Plumbing Labor for Shower (HRS) 8 x $137.50 (Was 550 there was more costs with the longer bath nozzle)
Jolly Edge Trim (LF) 24 x $13.75
Install Jolly Edge Trim (HRS) 2 x $93.50
Install lights and fan that client purchased (Electrical guy had to come in)
RedGard Waterproofing Membrane (GAL) 2 x $60.50
Patch holes and paint areas where the old waterlines were and the hole from the electrical was.
(Recon) Insurance Cost
Plumber’s Putty/Silicone (EA) 1 x $5.81
Wax Ring (EA) 1 x $10.97
Poly Grout (GAL) 2 x $49.50
Tile and Labor for Floor
Modified Thinset Mortar, Gray (Bag) 6 x $24.20
Tile Leveling System Kit (EA) 2 x $38.50
Porcelain Floor Tile, Standard Grade (SF) 45 x $4.95
Supply Lines (EA) 2 x $11
Toilet Supply Line (EA) 1 x $8.80
Water Shut-off Valves (EA) 2 x $27.47
Plumbing Labor for toilet and sink
Toilet Mounting Bolts (EA) 1 x $4.57
1/2 inch Drywall (SF) 32 x $0.71
Joint Compound (EA) 1 x $13.75
Drywall Tape (EA) 1 x $4.95
Drywall Screws (EA) 1 x $9.62
Drywall Installation & Finishing Labor (HRS) 4 x $93.50
Wall Texture Spray (EA) 1 x $17.05
Wall Texturing Labor (HRS) 2 x $93.50
Interior Paint (GAL) 1 x $49.50
Paint Supplies (Brushes, Rollers, Tape) (EA) 1 x $38.50
Painting Labor (HRS) 3 x $93.50
Cement Tile Backer Board for floor, 1/2 inch (SF) 45 x $1.12
Cleaning Supplies (EA) 1 x $82.50
Final Cleanup Labor (HRS) 8 x $93.50
Replace and paint trim on door and baseboard
New transition (Gold)
Fix floor area by shower that was deteriorating
Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.
We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.
Please take a chance to review your estimate and click accept. For payments over $1000.00, we require 50% of the payment. The price is subject to change if scope of work increases.
Estimate viewed by Tylor Desilet (Tylor.D) for the first time.
Status changed: Draft to Pending.
Estimate viewed by for the first time.
Estimate viewed by 83.99.151.65 for the first time.
Estimate viewed by 69.92.5.133 for the first time.
Estimate viewed by 66.249.68.2 for the first time.
Estimate viewed by 174.126.217.171 for the first time.
Estimate viewed by 83.99.151.71 for the first time.
Estimate viewed by 83.99.151.66 for the first time.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate updated by Tylor.D.
Estimate viewed by 2600:387:f:711b::7 for the first time.
Estimate viewed by 14.235.34.196 for the first time.
Estimate viewed by 138.36.57.81 for the first time.
Estimate viewed by 123.31.246.87 for the first time.
Estimate viewed by 45.162.74.25 for the first time.
Estimate viewed by 2001:ee0:4b8a:2a3b:a80f:fda5:1311:199 for the first time.
Estimate viewed by 2001:ee0:51c4:d434:6df2:5c48:4dbd:bf00 for the first time.
Estimate viewed by 177.67.35.254 for the first time.
Estimate viewed by 170.233.31.192 for the first time.
Estimate viewed by 41.249.32.11 for the first time.
Estimate viewed by 179.235.4.227 for the first time.
Estimate viewed by 2001:ee0:4f3d:e790:75ed:16d4:3228:f49c for the first time.
Estimate viewed by 45.171.120.27 for the first time.
Estimate viewed by 46.151.151.41 for the first time.
Estimate viewed by 177.125.174.251 for the first time.
Estimate viewed by 14.186.51.149 for the first time.
Estimate viewed by 45.162.37.230 for the first time.
Estimate viewed by 189.150.178.67 for the first time.
Estimate viewed by 177.161.253.86 for the first time.
Estimate viewed by 113.170.133.53 for the first time.
Estimate viewed by 5.138.69.215 for the first time.
Estimate viewed by 181.112.91.169 for the first time.
Estimate viewed by 168.121.68.81 for the first time.
Estimate viewed by 2001:ee0:52c2:50f6:dc9f:37e9:ab15:e88d for the first time.
Estimate viewed by 186.205.12.90 for the first time.
Estimate viewed by 186.153.19.153 for the first time.
Estimate viewed by 2001:ee0:4f38:cf41:71fd:6576:4b17:fb96 for the first time.
Estimate viewed by 146.174.163.151 for the first time.
Estimate viewed by 146.174.174.52 for the first time.
Estimate viewed by 83.99.206.230 for the first time.
Estimate viewed by 83.99.206.166 for the first time.
Estimate viewed by 83.99.206.147 for the first time.
Estimate viewed by 83.99.206.182 for the first time.
Estimate viewed by 83.99.206.73 for the first time.
Estimate viewed by 83.99.206.241 for the first time.
Estimate viewed by 83.99.206.254 for the first time.
Estimate viewed by 83.99.206.25 for the first time.
Estimate viewed by 83.99.206.100 for the first time.
Estimate viewed by 83.99.206.37 for the first time.
Estimate viewed by 83.99.206.253 for the first time.
Estimate viewed by 83.99.206.219 for the first time.
Estimate viewed by 83.99.206.235 for the first time.
Estimate viewed by 83.99.206.165 for the first time.
Estimate viewed by 83.99.206.151 for the first time.
Estimate viewed by 83.99.206.247 for the first time.
Estimate viewed by 14.186.16.210 for the first time.
Estimate viewed by 2a02:c7c:6c67:7700:abeb:d12e:7d97:ba2e for the first time.
Estimate viewed by 83.99.206.14 for the first time.
Estimate viewed by 83.99.206.98 for the first time.