Issued: August 15, 2024 by:

Boise Mold Removal

Tylor Desilet
PO Box 785
Caldwell, ID 83606
US
Expires:

September 14, 2024

VAT

Estimate

Task 1.0

Contain area for remediation in crawlspace. This includes running runners on the floor outside of containment. (Containment eliminates any contaminates from existing into the livable space. Without the containment also the insulation, if removed can possibly enter the livable space, kicking insulation, dirt and possible mold-like substance around. We can pull the containment after remediation has taken place.)

Rate

$225

Qty

1

%

0%

Amount

$225

Task 2.0

Run air scrubber (An air scrubber is designed with a dual filtered system in an arear to eliminate any possible contaminates from going through the home. The air scrubber is ran on a daily based per the whole duration of the job.)

Rate

$75

Qty

1

%

0%

Amount

$75

Task 3.0

HEPA vacuuming areas in the crawlspace where the growth can become airborne, your other home had growth that was treatable only. (This is a pre and post process. HEPA vacuuming is a process of pulling all contaminates off a surface area. This process eliminates mold particles from a surface area with specific vacuums without contaminating the air quality of a livable space. HEPA vacuuming is normally done before and after to reassure no particles are in the space that was contaminated).

Rate

$575

Qty

1

%

0%

Amount

$575

Task 4.0

Treatment with anti-microbial solution in crawlspace. This treatment will be on the delegated areas of growth. (Treatment is performed with an anti-microbial solution that eliminates and prevents future growth. All treatment is warrantied for 3yrs. unless Boise Mold Removal does not provide a warranty under the stipulations of the client not solving the underlying issue that caused the growth in the first place.)

Rate

$2,775

Qty

1

%

0%

Amount

$2,775

Task 5.0

Preventative treatment with anti-microbial solution the adds an extra measure to eliminate growth in crawlspace. This will be sprayed on the whole crawlspace. We will also wipe down the insulation that has a backing on it. 

Rate

$3,375

Qty

1

%

0%

Amount

$3,375

Task 6.0

PPE (Personal Protective Equipment) (This is safety equipment for our techs to wear during remediation practices. This is a per person per day basis. There will need to be new PPE every day for proper safety. This includes the Tyvek suits, gloves, and any filters per the duration of the job).

Rate

$75

Qty

4

%

0%

Amount

$300

Yet to be Approved

Info & Notes

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Estimate expires in 5 Days Decline Estimate Accept Estimate

Estimate History

Status Update 24 days ago

Status changed: Draft to Pending.

Status Update 24 days ago

Status changed: Draft to Pending.

Viewed 24 days ago

Estimate viewed by for the first time.

Viewed 23 days ago

Estimate viewed by 66.249.72.65 for the first time.

Viewed 23 days ago

Estimate viewed by 66.249.72.71 for the first time.