Checkout

— OR —

Contact information

Billing details

Additional information

Your order

Product Subtotal
Removal of Drywall. This is for a max 3ft. flood cut throughout the whole storage area. (Drywall is removed at times to expose areas where remediation is to take place. This price includes the disposal as well.)  × 1 $625.00
Removal of batt insulation. This is for a max 3ft. flood cut throughout the whole storage area. (This includes bagging up the insulation and disposing of it. IICRC certification requires all mold remediation companies to remove insulation when the growth is over 10sqft. This is a square footage calculation.)  × 1 $460.00
HEPA vacuuming. This is for a max 3ft. flood cut throughout the whole storage area. (HEPA vacuuming is a process of pulling all contaminates off a surface area. This process eliminates mold particles from a surface area with specific vacuums without contaminating the air quality of a livable space. HEPA vacuuming is normally done before and after to reassure no particles are in the space that was contaminated).  × 1 $750.00
Treatment with anti-microbial solution. This is for a max 3ft. flood cut throughout the whole storage area.(Treatment is performed with an anti-microbial solution that eliminates and prevents future growth. All treatment is warrantied for 3yrs. unless Boise Mold Removal does not provide a warranty under the stipulations of the client not solving the underlying issue that caused the growth in the first place.)  × 1 $2,350.00
PPE (Personal Protective Equipment) (This is safety equipment for our techs to wear during remediation practices. This is a per person per day basis. There will need to be new PPE every day for proper safety. This includes the Tyvek suits, gloves, and any filters per the duration of the job).  × 1 $300.00
Add drying equipment (An air mover is designed to dry out areas where moisture has occurred. The equipment will run the duration of the job until the moisture content has hit the IICRC's standards for an acceptable level. This is a bigger unit and is charged on a per day basis)  × 1 $300.00
Replacement of drywall. This is for a max 3ft. flood cut throughout the whole storage area. (This includes drywall, tape and mudding to get a flat surface that is roughed in. There will be 5/8 drywall on the firewall on one of the walls.)  × 1 $1,325.00
Install New Batt Insulation. This is for a max 3ft. flood cut throughout the whole storage area.(Insulation R-value will be determined by the standard that Idaho has set for various areas of the home and the region of the state signified through the IDAHO ENERGY CONSERVATION CODES.)  × 1 $1,400.00
ADDITIONAL BID ITEM (We sent video where the client has asked us to replace certain horizontal boards that are noted in certain sections of the video). (Sealant will be added around the exterior of the building to attempt to seal the exterior of the building to the best of the ability of strictly sealant can achieve. Damages may be concerning behind wall that has penetrations currently in it).   × 1 $1,075.00
Subtotal $8,585.00
Total $8,585.00 USD

Your personal data will be used to process your order, support your experience throughout this website, and for other purposes described in our Privacy policy.