Issued: February 11, 2025 by:

Boise Mold Removal

Tylor Desilet
PO Box 785
Caldwell, ID 83606
US
Due:

February 25, 2025

VAT

Attachments


  • IMG_0148

  • IMG_0149

  • IMG_0150

  • IMG_0151

  • IMG_0152

  • IMG_0153

  • IMG_0154

  • IMG_0155

  • IMG_0156

  • IMG_0158

  • IMG_0159

  • IMG_0160

Payment Pending

Task 1.0

Contain Area for Remediation (Containment eliminates any contaminates from existing into the livable space. Without the containment also the insulation, if removed can possibly enter the livable space, kicking insulation, dirt and possible mold-like substance around. We can pull the containment after remediation has taken place. Cost is relayed on a linear foot basis)

Rate

$230

Qty

1

%

0%

Amount

$230

Task 2.0

PPE (Personal Protective Equipment) (This is safety equipment for our techs to wear during remediation practices. This is a per person per day basis. There will need to be new PPE every day for proper safety. This includes the Tyvek suits, gloves, and any filters per the duration of the job).

Rate

$75

Qty

2

%

0%

Amount

$150

Task 3.0

Treatment with anti-microbial solution. This includes the growth in the crawlspace, underneath the master shower, underneath the kitchen sink, and behind the drywall in the laundry room.(Treatment is performed with an anti-microbial solution that eliminates and prevents future growth. All treatment is warrantied for 3yrs. unless Boise Mold Removal does not provide a warranty under the stipulations of the client not solving the underlying issue that caused the growth in the first place.)

Rate

$675

Qty

1

%

0%

Amount

$675

Task 4.0

Move washer and dryer to expose drywall where water leaked into

Rate

$50

Qty

1

%

Amount

$50

Task 5.0

Open up drywall behind the washing machine. There will also be insulation that will need to be removed. Once the drywall is removed, there will be treatment on the lumber. Also haul debris away.

Rate

$100

Qty

1

%

Amount

$100

Task 6.0

Remove and replace bottom shelving under kitchen sink. This will be exposed to treat any growth underneath it.

Rate

$675

Qty

1

%

Amount

$675

Task 7.0

Remove master shower to expose the lumber underneath it. Most likely the subfloor will need to be replaced. At this time, any treatment will be done to the lumber for growth that is potentially on it.

Rate

$775

Qty

1

%

Amount

$775

Task 8.0

Add gutter to the back side of the house, approximately 32 linear feet, with downspout.

Rate

$525

Qty

1

%

Amount

$525

Task 9.0

Install new shower in the master bathroom. This is the price for a shower with a tile surround. Client will purchase the tile (Cost for that is taken off Roughly 85sqft. of tile.) 

Rate

$3,245

Qty

1

%

Amount

$3,245

Task 10.0

Fix the drain line and the clean out in the crawlspace. This will eliminate any moisture in the crawlspace.

Rate

$475

Qty

1

%

Amount

$475

Task 11.0

Remove and replace insulation in crawlspace where water was by two drains

Rate

$100

Qty

1

%

Amount

$100

Task 12.0

Remove mold, silicone clean growth and reinstall silicone around kitchen sink.

Rate

$75

Qty

1

%

Amount

$75

Task 13.0

Fix the waterline underneath the sink in the kitchen. Includes extra labor under house, sink and faucet. (There was additional work done to fix this area, original was 175.) Includes all new pex lines from laundry to dining room.

New box/valves and vent to the laundry room. (EXTRA 2/7/25)

Rate

$1,775

Qty

1

%

Amount

$1,775

Task 14.0

Fix the wax ring around the guest toilet.

Rate

$125

Qty

1

%

Amount

$125

Task 15.0

Additional gutter work (EXTRA 2/7/25)

Rate

$425

Qty

1

%

Amount

$425

Total Owed

Info & Notes

Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Balance of $5,700.00 is Overdue Make a Payment

Make a Payment

Please enter your payment information to pay this invoice. A receipt for your records will be sent to you. Thank you very much!

Invoice History

Status Update 68 days ago

Status changed: Pending to Draft.

Status Update 68 days ago

Status changed: Draft to Pending.

Payment 69 days ago

Admin Payment - Added By: tylor-dPayment Total: $3,700.00

Status Update 68 days ago

Status changed: Pending to Outstanding Balance.

Updated 68 days ago

Invoice updated by Tylor.D.

Viewed 68 days ago

Invoice viewed by 2a01:111:f400:7e8a::100 for the first time.

Viewed 68 days ago

Invoice viewed by 69.92.143.150 for the first time.

Viewed 68 days ago

Invoice viewed by 213.188.64.28 for the first time.

Viewed 68 days ago

Invoice viewed by 206.204.10.13 for the first time.

Viewed 33 days ago

Invoice viewed by 83.99.151.71 for the first time.

Viewed 26 days ago

Invoice viewed by 83.99.151.69 for the first time.

Viewed 21 days ago

Invoice viewed by 83.99.151.67 for the first time.

Viewed 15 days ago

Invoice viewed by 83.99.151.68 for the first time.

Viewed 5 days ago

Invoice viewed by 83.99.151.70 for the first time.