Issued: August 7, 2025 by:

Boise Mold Removal

Tylor Desilet
PO Box 785
Caldwell, ID 83606
US
Due:

August 21, 2025

Payment Pending

Task 1.0

**Demo**
Removal of old shower

Removal of old lights 

Pulling vanity to build up height

Price Before Additions 0

(Additional Work: Demoed ceiling around shower to raise height, also needed to frame areas up to reassure that the structure was secure also drywalled the area.)

Rate

$325

Qty

1

Amount

$325

Task 2.0

New Shower Install
**Tile Pan and Tile to Ceiling (Extended approximately a foot wider):**

   – **Install Waterproofing and Pan** This requires tying into the pre-existing drain-line with drain located in the center.

   – **Task Details:** Installing tiles on floor to drain properly. Install tiles from floor level up to the ceiling in the shower area.

   – **Considerations:** Waterproofing, tile pattern, grout color.

   – **Curbed Shower Build:**

   – **Task Details:** Constructing a shower area with a low barrier (curb), installing shower base, tiling.

   – **Considerations:** Drainage slope, accessibility.

 **Bench Installation:**

   – **Task Details:** Building a fixed bench within the shower area for seating or soaps.

-(Added New On This Bid*** 1 shower niche***)

   – **Considerations:** Material, water resistance.

 **Shower Handles:**

   – **Task Details:** Installing grab bars and controls for shower use.

   – **Considerations:** Safety, ADA compliance, material finish.

**Fixtures Installed**

  – ** Shower Fixture** Fixtures will have extra handle for client to use.

We will also paint whole bathroom

Price Before Addition: 3962

(Additional Work: We added tile for the right side of the vanity side. I bought that tile.)

Rate

$4,237

Qty

1

Amount

$4,237

Task 3.0

Lighting (Can Lights)

   – ** Replace old lighting with can lighting and 1 light**
Light will be like the other bathroom light located in the shower.

Rate

$500

Qty

1

Amount

$500

Task 4.0

**Vanity Area**
**Granite Countertops:**

   – **Task Details:** Measuring the area, selecting a granite slab, cutting, polishing, and installing.

   – **Considerations:** Edge style, thickness, and sealing for protection.

 **Vanity Adjustment:**

   – **Task Details:** Modifying existing vanity dimensions or features to fit new elements. We will have to adjust plumbing as well for height change.

   – **Considerations:** Matching or blending finishes with new components.

 **Sink Replacement:**

   – **Task Details:** Removing the old sink, choosing new sink style, installation, and reconnection of plumbing.

   – **Considerations:** Single or double sink, material (porcelain, glass, stone).

**Tile Backsplash:**

   – **Task Details:** Selecting tiles, preparing the wall surface, cutting and applying tiles with adhesive.

   – **Considerations:** Design style, color, and material choice—ceramic, porcelain.

**Fixtures (Sink):**

   – **Task Details:** Selecting and installing faucets with proper fittings.

   – **Considerations:** Finish (chrome, brass, nickel), water efficiency, and style.

(Additional Info: Backsplash tile cost was a wash with the cost for the backsplash piece and cuts)

Rate

$4,175

Qty

1

Amount

$4,175

Task 5.0

Add New Customer Preference Baseboard in Bathroom. Painted to match home.

Rate

$175

Qty

1

Amount

$175

Task 6.0

Patched 2 holes in the home and skim coated 3 walls by the light switch, the wall to the right of the shower and the wall under the area where the mirror was. Also had to build up header area to look appealing with it being off.

Rate

$425

Qty

1

Amount

$425

Total Owed

Info & Notes

Thank you for choosing Boise Mold Removal. All remediation work is warrantied for 3 years if the client fixes the underlying issues that caused the growth in the first place and no further moisture damage occurs.

Terms & Conditions

We expect payments upon the completion of the job. There will be a 3% interest charge per month on late invoices.

Please take a chance to review your estimate and click accept.  For payments over $1000.00, we require 50% of the payment.  The price is subject to change if scope of work increases.

Balance of $3,231.00 is Overdue Make a Payment

Make a Payment

Oh no! So sorry. There are no payment options available for you to make a payment. Please let me know so I can figure out why.

Invoice History

Status Update 291 days ago

Status changed: Pending to Draft.

Status Update 291 days ago

Status changed: Draft to Pending.

Payment 292 days ago

Admin Payment - Added By: tylor-dPayment Total: $2,200.00

Status Update 291 days ago

Status changed: Pending to Outstanding Balance.

Updated 291 days ago

Invoice updated by Tylor.D.

Updated 291 days ago

Invoice updated by Tylor.D.

Updated 291 days ago

Invoice updated by Tylor.D.

Updated 291 days ago

Invoice updated by Tylor.D.

Payment 292 days ago

Admin Payment - Added By: tylor-dPayment Total: $4,406.00

Status Update 291 days ago

Status changed: Pending to Outstanding Balance.

Updated 291 days ago

Invoice updated by Tylor.D.

Updated 286 days ago

Invoice updated by Tylor.D.

Viewed 286 days ago

Invoice viewed by 184.155.174.63 for the first time.

Viewed 284 days ago

Invoice viewed by 2607:fb91:1e02:82df:d080:856b:11e:620 for the first time.

Updated 284 days ago

Invoice updated by Tylor.D.

Viewed 269 days ago

Invoice viewed by 2001:ee0:486c:83d1:74ee:6d45:cd90:48b9 for the first time.

Viewed 250 days ago

Invoice viewed by 177.37.78.77 for the first time.

Viewed 247 days ago

Invoice viewed by 45.170.226.230 for the first time.

Viewed 246 days ago

Invoice viewed by 179.0.34.53 for the first time.

Viewed 244 days ago

Invoice viewed by 168.228.201.51 for the first time.

Viewed 239 days ago

Invoice viewed by 220.181.90.236 for the first time.

Viewed 238 days ago

Invoice viewed by 190.97.237.70 for the first time.

Viewed 236 days ago

Invoice viewed by 45.175.185.65 for the first time.

Viewed 233 days ago

Invoice viewed by 186.225.177.117 for the first time.

Viewed 233 days ago

Invoice viewed by 59.153.44.135 for the first time.

Viewed 228 days ago

Invoice viewed by 165.165.112.103 for the first time.

Viewed 227 days ago

Invoice viewed by 2001:ee0:4f3e:9e8e:5df9:b8d3:d229:82f for the first time.

Viewed 224 days ago

Invoice viewed by 14.182.1.190 for the first time.

Viewed 224 days ago

Invoice viewed by 201.92.241.245 for the first time.

Viewed 220 days ago

Invoice viewed by 190.109.97.117 for the first time.

Viewed 219 days ago

Invoice viewed by 160.191.130.77 for the first time.

Viewed 216 days ago

Invoice viewed by 160.30.63.57 for the first time.

Viewed 215 days ago

Invoice viewed by 177.2.182.41 for the first time.

Viewed 213 days ago

Invoice viewed by 177.101.43.192 for the first time.

Viewed 212 days ago

Invoice viewed by 179.189.138.151 for the first time.

Viewed 210 days ago

Invoice viewed by 38.51.31.218 for the first time.

Viewed 206 days ago

Invoice viewed by 45.237.163.109 for the first time.

Viewed 137 days ago

Invoice viewed by 83.99.206.178 for the first time.

Viewed 133 days ago

Invoice viewed by 83.99.206.253 for the first time.

Viewed 129 days ago

Invoice viewed by 83.99.206.95 for the first time.

Viewed 128 days ago

Invoice viewed by 202.76.142.84 for the first time.

Viewed 125 days ago

Invoice viewed by 83.99.206.219 for the first time.

Viewed 125 days ago

Invoice viewed by 146.174.163.171 for the first time.

Viewed 124 days ago

Invoice viewed by 200.4.105.31 for the first time.

Viewed 118 days ago

Invoice viewed by 83.99.206.254 for the first time.

Viewed 111 days ago

Invoice viewed by 83.99.206.37 for the first time.

Viewed 97 days ago

Invoice viewed by 83.99.206.230 for the first time.

Viewed 88 days ago

Invoice viewed by 83.99.206.151 for the first time.

Viewed 85 days ago

Invoice viewed by 83.99.206.25 for the first time.

Viewed 75 days ago

Invoice viewed by 83.99.206.133 for the first time.